MCIS Integrated Services

Manchester Airport Group – Airfield Drainage Improvements

Our client MAG, requested a solution to the flooded airfield cable, catchment pits and ducts

The Challenge

Delivering the project on a live airfield during day light hours.

Disposal of captured contaminated surface water within the airfield drainage system.

The Solution

Designed and installed submersible pump stations and control strategy at various locations across the airfield, pumping to designated storage locations.

The Outcome

Airfield cable, catchment pits and ducts were clear of standing contaminated water, enabling the airfield lighting and HV upgrade project.

mcis-logo-engineering
mcis-logo-utilities
mcis-logo-projects2

Liaison

Laison with airfield operations for access to airfield under full aircraft operations.

Consideration

Special consideration required for inclement weather and low visibility procedures.

Project Success

Project successfully delivered a solution to the aged issue of over flow of contaminated surface water into the natural water courses.